Glenfield to Leppington Rail Line Project
About the Project
- Client: John Holland
- Duration: 2013-2015
- Location: Glenfield to Leppington (NSW)
Scope: MRG were engaged in the construction and delivery of 680 OHW structures foundations. Continuous consultation and programming meetings were integral parts of the planning process to ensure planned target dates were achieved with maximum quality and minimum disruption with other workgroups. In addition, Metro Resources Group teams were required to assist in the delivery and completion of CSR, local route, signal base installation, mandrelling / proofing of all cable routes.